Watch me install a new metal roof on the eco ranch.
How much do you overlap sheets of 5v roofing.
Once the first sheet is in place you need to install the remainder of the lowest row of corrugated metal roofing.
There are installation tips and a pretty nice finished roof.
Any end laps must be supported by a suitable purlin.
On the eave side of the roof aim to overhang the panels by 1 to 1 5 inches.
Secure the sheets into place with screws.
If you re installing a metal roof on a home without gutters you can overhang the panels by twice that amount.
Install the roofing screws vertically along each rib in the panel.
How to cut metal roofing.
Overlapping anti condensation lined sheets.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
If your panels aren t layered properly water damage can occur.
The position of purlins at the upper and lower ends of the roof and at the sheet overlaps are the critical points there must be purlin where you need to nail.
Finally enter the coverage area width of the panels you plan to buy.
The easy installation involves placing metal panels on your roof but you ll need to be mindful of metal roof overlap.
Side overlap is number of corrugations.
Important when using anti condensation lined sheets it is very important that you negate the properties of the liner on any part of the sheet that is going to be overlapped.
Each style of panel is unique and may have a different actual width and exposed width.
We recommend about 2.
Purlins must be at the correct centres and size for the material and slope of the roof.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
When installed correctly they can last a very long time with little maintenance.
For instance a 38 panel will have an effective coverage width of 36.
Make sure the panel is square to the roof line.
The sheets should overlap by at least four inches add a bead of caulk where they overlap and at the other end of the building ensure there s an overhang of two inches.
If end laps are required you should allow 300mm minimum overlap sealed with butyl sealant tape 10mm from the edge of each overlapping sheet as well as in the middle of the overlap.
Metal roofs though less appealing than shingle or tile is a more fire resistant and heat reflecting roofing option.
This will ensure that the liner will not.