Exterior cladding or siding as it is often called can change the entire look of a house.
How much siding do i need for a 2 car garage.
It can give it an entirely different l.
When your customers need to replace or repair siding for their homes come to lowe s to take advantage of tools like our siding estimator that can help you stay on schedule and under budget.
If the garage has gable ends measure each one to determine how much siding you will need.
Total square feet please enter side s surface area.
Ten percent 10 has been added as a safety measure to cover any waste from trimming and minor miscalculations.
Steps 2 and 3 have been added together and step 4 has been subtracted from this sum.
Range from less than 1 square foot for do it yourself panels from a building supply store to 2 7 or more if installed by a contractor.
A guide to calculating how much siding you need for a garage renovation project.
It also doesn t include an accurate estimate of the fasteners you ll need.
In our example that was 8 feedt.
Multiply each length and height measurement to find the square footage of each wall then add them together to find the total square footage.
If your garage is going to blend into the architecture of your home it s likely going to require a traditional 2x4 stud framed structure and with that comes the huge range of choices for roofing siding windows doors garage doors and hardware flooring and more.
Not only can you pick up your vinyl siding wood siding and fiber cement siding at lowe s but our online siding calculator and vinyl siding calculator can help you quickly determine how much material.
Print this cost estimate worksheet out and take it down to your local building supply store to calculate the cost to build a 24 24 two 2 car garage using my garage plans.
Start by measuring the height and width of each wall of the building.
So if the total height to the top of the peak was 18 feet you would start with a gable height of 10 feet.
Subtract the wall height that you already measured for the other walls.
Measure from the very peak down to the ground.