Glue assist or just nail down.
How to glue engineered hardwood flooring.
Do not pre spread the adhesive over the entire sub floor as it will dry before you get to that area.
The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.
Slide the tongue connector of the new board into the groove of the adjacent row then press the board flat so that it fits into the opening.
Plan to nail down the engineered hardwood flooring when you have a wood subfloor.
You may have to cut the first board using a circular or miter saw with a blade designed for engineered wood flooring.
In recent years everyone is talking about using adhesive to help with fastening wide plank floors.
When you run into columns or doorways cut the planks to fit on both sides taking care to maintain the expansion gap.
Floating vs glue down hardwood floors when considering engineered hardwood flooring there are really only two options that make sense floating or glue down.
Add more adhesive to the bottom of the board if your floor is glued in place.
While installing be sure to do small areas at a time.
Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
You don t want the adhesive drying before you can get to that area.
The nwfa guidelines state if adhesive is used with nailing follow wood and or adhesive manufacturer s instructions for installing plank flooring here is something to keep in mind.
Only spread the adhesive over small areas ahead of you at any given time.
When working on a clean concrete subfloor the glue down method is often the go to choice.
What s the best glue for your engineered wood flooring.
As long as you use the correct pneumatic nail gun this technique provides the installer with a simple and controlled approach to the installation.
Whatever glue product recommended by the manufacturer.
The adhesive is spread on an area of the subfloor where the boards are going to be adhered to using a specialized trowel.
Pass the trowel through the glue at a 45 degree angle and install engineered flooring immediately after the adhesive is spread.