Prepare the area for installation.
How to install a floor pan for a shower.
Pre drill holes through the shower pan rim at the marked locations.
Use the level to make sure all sides of the pan slope toward the drain.
Make any additional surface preparations that are recommended by the shower pan manufacturer as necessary such as applying a fresh coat of a water seal product to the.
You will later screw the shower pan into the.
If it s not level you ll have to compensate by shimming the shower pan until it s level and then affixing it to the.
Use a broom or a vacuum to clear loose debris.
Before installation use a four foot level to check the bathroom floor.
Wait three days for the mud to dry and cure before waterproofing it.
What do you do.
Clear all debris and old adhesive from the surface.
Notice the liner in the diagram below goes up the walls and over the curb.
Ideally you re putting it in an area where a drain has already been roughed in.
The pvc shower pan liner is a flexible waterproofing membrane that can be purchased at lowes or home depot.
How to build shower floor 2 liner drain now that the curb and pre slope layer of deck mud is complete you are ready to install the shower pan liner.
Test fit the shower pan to confirm the drain opening fits over the drain hole in the floor.
Paint over the entire pan including corners nooks and the perimeter with a liquid waterproofing product.
Remove debris at the area of the subfloor where the shower pan installs using a shop vacuum.
Installing a base on concrete.
When you re installing a fiberglass or acrylic shower liner enclosure not to be confused with a shower curtain and base over a concrete floor special considerations should be taken to minimize leaks.
Use a wide blade putty knife or a paint scraping tool to peel off old caulking and adhesive.
Where do you start.
Hammer down any protruding nails used to fasten the subfloor to the floor joists below.
Easy by brewing up a nice hot cup of joe and w.
Mark the outline of the shower pan on the subfloor using pencil or a chalk line.
Time to replace that old nasty shower.