Option 1 face nail using finish nails then angle nail the first few rows of boards you install.
How to install hardwood floors with nails.
Align the edge of the board with the chalk line and drill pilot holes down through the hardwood plank and into the sub floor and joist.
Flooring nails have special qualities that make them suitable for the job.
On the last row cut the pieces to fit measuring the distance from the wall to the board not the tongue minus the expansion gap.
This will keep your very first rows straight where wall prevents the use of the floor nail gun.
Finish hardwood floor installation when you get to the last few rows switch back to nailing by hand.
The humble nail has a long history of craftsmanship behind every bag or box.
Pick one that is straight.
Begin by selecting a long board to start the first row.
Learn how to install solid hardwood flooring with a few simple tools.
Here s how to install flooring using the nail down method.
Engineered flooring can be installed above grade at grade and below grade level do not install hardwood flooring in bathrooms.
Option 2 face nail using electric brand nail gun or finish nail gun the first few rows of boards you install.
Always check with the manufacturer s instructions to determine if your hardwood floor can be installed over an in floor radiant heat system.
Solid hardwood flooring only can be installed on or above ground level with a plywood subfloor.
Types of nails for laying hardwood floor.
Face nail each board at the point of every joist and set the nail with a nail set.