Step 3 plan your layout.
How to install tile shower floor over concrete.
Also consider that doors cabinets and other hardware might need to be reworked or replaced with new ones to compensate for the higher floor.
Pour the concrete and spread it out with a trowel.
When it comes to mortar latex or epoxy options are best for installing tile over tile.
If anything it would be difficult to screw the cbu into the concrete especially with the middle layer of thin set.
This is an optional step but can really benefit your tile installation in the long run.
Pre slope is required in order to allow water collected on the shower membrane to drain into the weep holes of your shower drain assembly.
Grind them down with a grinder.
If your old ceramic tile is worn or dated you can lay new tile right over the old and avoid the huge job of tearing out the old tile.
A concrete sealer prevents moisture from staying underneath the ceramic tiles.
Pick up the tile nearest.
Use a thin set product to install ceramic tile over existing tiles.
Remember tile and mortar are not waterproof.
This is a mixture of cement fine grain sand and water that will adhere the new tile to the old.
It will also provide a stronger adhesion between mortar and concrete.
Deck mud also known as floor mud or dry pack mortar is a simple mixture of sand portland cement and water.
Shift the tiles as needed to reduce the number of tiles that need to be cut for the edges of the wall.
Whether you ll be installing tile over your shower s concrete floor or leaving it bare you will need to use a mixture called deck mud to form the shower s base.
Most tile professionals agree that attaching a cbu to a concrete floor would be more trouble than it is worth.
Roughen the tile with 80 grit sandpaper.
Install tile over concrete 1 dry fit the ceramic tiles on the floor.
Lay a set of tiles along the lines without adhesive to dry fit a row.
Plan the layout so there are full sized tiles in front of the bathtub and in the doorway.
Using concrete mix create a 1 4 per foot slope to the shower drain.
The height of the concrete should gently slope from 2 1 2 around the outside of the form to 1 1 4 near the drain.
Lay a level on the old tile and mark any high spots.